Assembly Guide
Easy Assembly,
Like Snapping Jigsaw Pieces
A modular system engineered for quick, easy, and safe installation — no heavy machinery or specialized crew required.
Fast Install
3–5 working days for medium projects
100% Modular
Expand or shrink anytime
No Heavy Machinery
4–6 people can do it
Tide-Friendly
Anchors adjust to water level
Re-deployable
Move or reshape later
Easy Maintenance
Replace single modules
Installation Steps
Six simple steps

Plan layout & dimensions
Our experts survey the site and design the pontoon layout to your needs. Number of modules and orientation are set.

Place modules on water
HDPE modules go in the water — light enough for 2–4 people to carry and place. No heavy equipment needed.

Connect modules
Stainless steel connectors lock modules together in minutes. No welding. No adhesives.

Add railings & deck surface
Install 330-kg-rated railings and lay anti-slip WPC decking — suitable for all weather conditions.

Anchor & moor
Anchor the platform with stakes or pillars. Adjusts naturally to rising and falling tides.

Inspect & hand over
Our team checks every connection and safety point, then hands over within 3–5 working days for medium projects.
Watch the Video
See it built in real life
FAQ
Common Questions
❓ How long does installation take?
A medium-sized project (100–200 m²) takes about 3–5 working days, depending on site complexity.
❓ Do you need specialized crew or machinery?
No. The modular system is designed to be installed by 4–6 people. No welding, no crane required.
❓ Can it be expanded or changed later?
Yes — modules can be added or removed at any time. The system is fully modular and reconfigurable.
❓ How much weight can it support?
Up to 350 kg/m² load capacity. Railings rated to 330 kg pull force.
❓ Do I need government permits?
It depends on the location and use case. Our team helps you with consultation and permit preparation.
Interested in installation?
Our team is ready for on-site survey and consultation — free of charge.